Filling of the Josefův Důl Waterworks Reservoir. In the picture - the main dam with the shaft overflow, the footbridge to the combined building and in the background the objects of the construction site equipment, around 1981
Filling of the Josefův Důl Waterworks Reservoir. In the picture - the main dam with the shaft overflow, the footbridge to the combined building and in the background the objects of the construction site equipment, around 1981
Spring aerial liming of the Souš Waterworks Reservoir in May 1996. The hollows on the left bank show places where there used to be a forest. Today, such a view is no longer possible - the forest restoration has been successful
Spring aerial liming of the Souš Waterworks Reservoir in May 1996. The hollows on the left bank show places where there used to be a forest. Today, such a view is no longer possible - the forest restoration has been successful